  • oh, no, it’s far worse than that. the last 90% is enough time to make what you thought was the first 90% become 10%.

    so 0.9*expected time = 0.1* actual time

    which, if you can do some very basic algebra, results in 900%. this implies that every project will seem “almost done” for about 9x the length of time you thought the project would take. in my experience, this is roughly correct