# While the ability to run trains across the floating bridge continues to be a major impediment to getting the full 2 Line running, other issues along the existing 1 Line could pose even greater challenges to maintaining consistent service.
I’m confused. Why do you mention crossing the street? The article points at a choke point. The crossover would allow trains to bypass a train that is otherwise stuck at a station. Otherwise, it takes one train to hold up an entire direction. It’s not about going the other way- it’s about maintaining service in one of the directions
I’m confused. Why do you mention crossing the street? The article points at a choke point. The crossover would allow trains to bypass a train that is otherwise stuck at a station. Otherwise, it takes one train to hold up an entire direction. It’s not about going the other way- it’s about maintaining service in one of the directions
You corrected me–I misunderstood what was crossing over. I.E. trains vs people.